Table 1. Outlet (Control) Pressure Ranges
Table 2. Maximum Outlet Pressures
OUTLET (CONTROL) PRESSURE RANGES
PILOT CONTROL SPRING
COLOR CODE (SEE PARTS
LIST FOR PART NUMBER)
Psig bar
Type 6492L Pilot Type 6492H Pilot Type 6492L Pilot Type 6492H Pilot
2 to 6
5 to 15
13 to 25
10 to 30
25 to 75
70 to 150
0,14 to 0,41
0,34 to 1,0
0,90 to 1,7
0,69 to 2,1
1,7 to 5,2
4,8 to 10,3
Yellow
Green
Red
CONSTRUCTION
MAXIMUM OPERATING
OUTLET PRESSURE
MAXIMUM EMERGENCY OUTLET PRESSURE
(IF EXCEEDED, PRESSURE VESSEL INTEGRITY MAY NOT
BE RETAINED AND PERSONAL INJURY OR PROPERTY
DAMAGE COULD RESULT)
Cast Iron Main Valve
and Pilot Body
Steel Main Valve
and Pilot Body
With Type 6492H pilot
150 psig
(10,3 bar)
250 psig (17,2 bar) or main valve
body rating limit, whichever is lower
300 psig (20,7 bar) or main valve
body rating limit, whichever is lower
With Type 6492L pilot
25 psig
(1,7 bar)
50 psig (3,4 bar) 125 psig (8,6 bar)
2. A Type 92W regulator may be installed in any
orientation, as long as ow through the regulator
matches the direction of the arrow on the main
valve body.
3. Apply liquid-compatible pipe compound to the male
pipeline threads for an NPT body, or use suitable
line gaskets for a anged body. Use acceptable piping
procedures when installing the regulator. .
4. If continuous operation of the system is required during
inspection and maintenance, install a three-valve
bypass around the regulator. If the owing medium
contains solids, install a properly sized strainer
upstream of the regulator.
Note
A regulator that has the Type 6492H or
6492L pilot with a 1/8-inch (3,2 mm) drilled
hole in the spring case may function
improperly if this spring case vent hole
becomes clogged. Install and maintain
such regulator so that the spring case vent
hole stays clear.
5. As shown in Figure 2, connect a control line as
large as possible but no smaller than 3/8-inch
(9,5 mm) diameter bushed down to the 1/4 NPT
connection in the cylinder spacer (NPS 1, 1-1/2,
or 2 body size) (DN 25, 40, or 50) or the pilot body
(NPS 2-1/2, 3, or 4 body size) (DN 65, 80, or 100).
With the NPS 2-1/2, 3, or 4 (DN 65, 80, or 100
body size, the pilot may be mounted as shown in
Figure 6 so that the control line connection faces
either upstream or downstream.
6. Locate the control line connection at least 10 pipe
diameters away from the regulator or swage and in a
section of straight pipe. .
7. Do not locate the control line connection in a gate,
plug, or check valve; or in an elbow, swage, or
other area of the pipeline where turbulence or
abnormal velocities may occur; or in a large-volume
vessel that can cause noticeable control lag.
8. Install a shutoff valve (not a needle valve) in the control
line to isolate the pilot during maintenance.
9. Install a pressure gauge in the control line, or near the
regulator, to aid in setting the outlet pressure.
10. With a pressure-loaded or on-off pilot, connect
the pressure-loading or on-off piping or tubing to
the 1/4 NPT connection in the tapped pilot
spring case.
11. The pressure setting of the regulator is determined by:
The pilot control spring adjustment on a standard
pilot, or .
The pressure-loading device in conjunction with the
control spring adjustment on a pressure-loaded
pilot. In both cases, check these settings to make
sure they are correct for the application.
Startup and Adjustment
Note
The maximum inlet pressure for a specic
construction is stamped on the main
valve nameplate. Use pressure gauges
to monitor upstream and downstream
pressures during startup. .