Emerson EZH and EZHSO Series Pressure Reducing Regulators Manual de Instruções Página 14

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 36
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 13
Europe,
Middle
East,
and
Africa
Document
Only
Types EZH and EZHSO
14
Connect the actuator to the impulse plug
keeping a minimum distance of 4 x D to a
straight run of the outlet pipe.
In the version with integrated slam shut
connect the safety manometric box (BMS) to
the outlet pipe keeping a minimum distance
of 4 x D to a straight run of the pipe.
In the case of functioning class B for the
slam shut it is necessary to regularly check
the safety manometric box (BMS) diaphragm.
Connect the reject tab to the outlet pipe.
It is recommended to separate the slam-shut
impulse from that of the actuator. Do not
connect impulses on the lower generator line.
It is recommended to install and isolation
tap and a vent tap. These can be useful for
slam-shut settings and verications.
Check that the pilot impulse is connected
and in the case of an isolating tap (not
recommended) that it is open.
No modification should be made to the
structure of the equipment (drilling,
grinding, soldering...).
It is recommended to install a servicing valve
on the outlet pipeline to facilitate adjustments
and bleeding off to the atmosphere.
In the version with integral slam shut, verify
that the safety manometric box (BMS)
and spring correspond to the appropriate
operating conditions on the outlet side of
the regulator.
The equipment should not receive any type
of shock, especially the release relay.
The user should verify or carry out a
protection adapted to the environment.
For DN 25 to 80, use long screws or threaded
stems when opening the actuator (warning
compressed spring).
The action of re, seismic and lightening
are not taken into consideration in standard
regulators. If required, a special product
selection and/or specic calculations may be
supplied according to specic requirements.
A regulator may vent some gas to the
atmosphere. In hazardous or ammable gas
service, vented gas may accumulate, causing
personal injury, death, or property damage
due to bursting of pressure-retaining parts.
Vent a regulator in hazardous gas service to
a remote, safe location away from air intakes
or any hazardous location. The vent line or
stack opening must be protected against
condensation or clogging.
All Installations (Single Regulator or
Monitor Systems)
A Type EZH or EZHSO regulator bleeds no gas to
atmosphere during normal operation, thus making the
regulator suitable for installation in pits and other enclosed
locations without elaborate venting systems.
This regulator can also be installed in pits subject to
ooding by venting the pilot spring case above the expected
ood level so that the pilot setting can be referenced to
atmospheric pressure.
1. Install the regulator so that the ow arrow on the main
valve matches the ow direction of process uid through
the regulator.
2. Apply pipe compound to the male pipeline threads
before installing a regulator with threaded NPT end
connections. Use gaskets between pipeline and
regulator anges when installing a regulator with
anged end connections. When installing buttweld end
connections, remove trim before welding and make
sure to use approved welding practices. Use approved
piping procedures when installing the regulator.
3. Type PRX pilots have a 1/4-inch NPT vent connection
in the spring case. To remotely vent gas from the
spring case, remove the screened vent, and connect
1/4-inch piping or tubing to the spring case connection.
The piping or tubing should vent to a safe location,
have as few elbows as possible, and have a screened
vent on it’s exhaust. Install the regulator and any
remote vent piping or tubing so that the vent is
protected from condensation, freezing, or substances
that my clog it.
CAUTION
To avoid freeze up due to pressure drop
and moisture in the gas, use anti-freeze
practices, such as heating the supply
gas or adding a de-icing agent to the
supply gas.
4. Connect the actuator to the downstream sense
line on a straight run of outlet pipe 8/10 (inside
diameter). Connect the other end of that impulse to
the Type PRX port.
5. Connect the PRX pilot port to the outlet pipeline at
a minimum distance of 4 x D from the regulators
outlet ange.
6. For Type EZHSO installation, a vent valve downstream
of the regulator is needed. It should be installed
directly in the Type PRX pilot bleed line connection
(line from port "S" to pipe). A full bore NPS 1/4
ball valve for the vent line is preferred to provide
sufcient ow.
Vista de página 13
1 2 ... 9 10 11 12 13 14 15 16 17 18 19 ... 35 36

Comentários a estes Manuais

Sem comentários