
Types EZH and EZHSO
24
Starting positions:
• Inlet valve à Open
• Outlet valve à Open
• Slam-shut valve plug à Open
• Regulator à In operation
Inlet and outlet side of the regulator are under pressure
Tight shut-off verication (and tripping verication for
versions with integral slam shut)
• Inlet valve à Closed
• Outlet valve à Closed
• Regulator Observe the evolution of the
outlet pressure
Control regulator tightness
SYMPTOMS CAUSE ACTIONS
If outlet pressure is stable
Observe the evolution of the inlet pressure
If inlet pressure decreases External leak
Locate and repair leak
or contact after-sales
If inlet pressure is stable The regulator is tightshut
Increase the set point until tripping occurs
(without exceeding the outlet limits)
If the slam-shut valve plug will not close Operation faulty
Control the release relay
Control the slam-shut valve plug
or contact after-sales
If the slam-shut valve plug closes Operation correct Bleed off outlet side
Close the vent and observe the evolution of the outlet pressure
If the outlet pressure increases Valve plug internal leak
Control the release relay
Control the valve plug and slam-shut orice
or contact after-sales
If the outlet pressure is stable The valve plug is tightshut
If the outlet pressure increases Internal leak Close pilot feed
If the outlet pressure stabilises Pilot leak
Control the pilot valve plug
or contact after-sales
If the outlet pressure increases Regulator internal leak
Control valve plug and orice
or contact after-sales
Table 9. Troubleshooting for Types EZH and EZHSO Regulators
A108
TROUBLESHOOTING
Servicing Check
Operations concerning the integral slam-shut version are in italic
Recommended frequency:
• 2 times per year
Verication:
• Set point verication
• Regulator valve plug tightness
• Tripping and setpoint value
• Slam-shut valve tightness
Comentários a estes Manuais